+1 800 823 2661 [email protected]
Tadano rough terrain crane lifting steel modules on industrial jobsite
Mobile Crane Engineering

Mobile Cranes Sized by Load Chart, Radius and Ground Pressure

Rough terrain, all terrain, crawler and city crane fleets with published SWL tables, ASME B30 / AS 2550 readiness and regional boom-pin parts coverage across 100 countries.

4,500+Cranes shipped yearly
100Countries served
98.6%Contracted uptime
24/7Field-service hotline
64 tSWL class @ mid radius
< 18hMean-time-to-repair
26Regional parts hubs
100%Tier 4 Final / Stage V options

Compliance Cards Lift Planners File Without Rewrites

Each Tadano crane family ships with certification dossiers EPC bidding desks and site safety officers can drop into tender binders as issued.

CE 2006/42/EC

CE 2006/42/EC

TÜV SÜD · Valid through 2027
EPA Tier 4 Final

EPA Tier 4 Final

EPA Family Cert · Renewed 2026
ISO 9001:2015

ISO 9001:2015

DNV · Re-audited 2026
ASME B30 / AS 2550

ASME B30 / AS 2550

Annual SWL re-cert pathway
ISO 14001

ISO 14001

Plant EMS · Scope maintained
ISO 45001

ISO 45001

OH&S · Cab & yard audits
EU Stage V

EU Stage V

Mobile machinery engines
ANSI ASME

ANSI / ASME

North America lift packages

Jobsite Classes Where Tadano Cranes Stay Productive

Working radius, outrigger spreads and ground-pressure options matched to the constraints of each lifting workflow.

Bridge precast segmental lift with crawler crane

Bridge Precast Lift

Petrochemical turnaround rough terrain crane

Petrochemical Turnaround

Port module set with all terrain crane

Port Module Set

Wind turbine component handling with crane

Wind Component Handling

What Lift Supervisors Report After Commissioning

"Their team re-certified our 90-ton crawler crane on-site in five working days. Zero downtime on bridge segment lifts through the rainy-season window."
Equipment ManagerBridge subcontractor, SE Asia
"Outrigger pad pressures matched the published chart within three percent on soft fill — we stopped second-guessing every pick above mid-radius."
Lift PlannerTier-1 EPC, Middle East
"Boom pin kits arrived before the night shift. Mean-time-to-repair on our contracted rough-terrain fleet stayed under eighteen hours."
Site SupervisorPetrochemical turnaround, Gulf Coast
450,000 m²Manufacturing footprint
5,600Employees worldwide
100Countries on active sites
$2.1BAnnual crane revenue
Night floodlit crane lift on industrial site

From Load Chart to First Pick — One Crane Engineering Desk

Share pick weight, working radius, boom length and ground-pressure limits. Field engineers respond with a scoped class recommendation within two working days.

Talk to a Lift Engineer